The BES system, with 4000 m² of geothermal storage, 300 m² of collector surface and two heat pumps for heating and cooling, was installed in this state-of-the-art industrial park with lorry docking stations, warehouses and office units.
The system supplies the six building sections via a micro-grid from two separate technical centres.