Lindenpark office and residential building in Linz

Building

The new construction of this modern combination of office and residential building in the centre of Linz uses the BES system with 2,700 m² of geothermal storage, 360 m² of collector surface and 400 kW of heat pump capacity. The office building with 4,400 m² and the residential building with 4,000 m² share a technical centre that enables the exchange of energy between the buildings.

67 % Contribution of renewable energy

84.484 kg Reduction in CO2 emissions / year

501.844 kWh Energy savings / year